Loading...
Loading data from Procore...
Procore Exhibit Generator
Home
Generate Exhibit
API Settings
Generate Exhibit
Exhibit Information
Procore Project
Select a project
Bid Package
Select a bid package
Exhibit Name
Division
Division 01 - General Requirements
Division 02 - Existing Conditions
Division 03 - Concrete
Division 04 - Masonry
Division 05 - Metals
Division 06 - Wood, Plastics, and Composites
Division 07 - Thermal and Moisture Protection
Division 08 - Openings
Division 09 - Finishes
Division 10 - Specialties
Division 21 - Fire Suppression
Division 22 - Plumbing
Division 23 - HVAC
Division 26 - Electrical
Division 27 - Communications
Division 28 - Electronic Safety and Security
Specification Sections
019113 – General Commissioning Requirements 019114 – Functional Testing Requirements All Division 21 078413 – Penetration Firestopping 078443 – Joint Firestopping 079219 – Acoustical Joint Sealants 083113 – Access Doors and Frames
General Notes
Trade Specific Items
Subcontractor is responsible for providing complete wet and dry sprinkler system design Complete wet and dry sprinkler systems installation Fire department connections, drain lines, and inspector test line locations Fire pump and fire pump controller Insulate and heat trace wet system in parking deck Temporary standpipes per NFPA, OSHA and AHJ requirements
Exclusions
Payment and Performance Bond (XX rate X%), if approved to enroll into CMAR SDI program (By CMAR)
Include Standard Allowances
Include Contract Recap Section
Preview Exhibit
Generate Exhibit
Exhibit Preview
Export PDF
Export DOCX
Preview will appear here
Click "Preview Exhibit" to see how your document will look.